How Many Drain Connections do I Need?

Determine how many pieces of equipment in your booth will require a separate drain line connection in your booth.

If you require more than (1) drain line outlet, order the first drain line at the "first outlet" rate. Each additional drain line outlet is at the reduced "additional" outlet rate. Inline and peninsula booths will find their drain line outlet(s) at the rear of their booth space. For island booths, all drain line outlet(s) ordered are dropped to one location (if services come from above) and then are distributed on the floor to other locations within the booth space. Time and material charges will apply for all distribution of services, whether on the floor or overhead. Overhead distribution may result in lift cost.

Note the number of connections you will require and the size of each connection.

Order Drain Labor

Determine the labor cost. There is a 1 hour minimum charge for the installation and 1 hour charge for the removal of all drain lines. To determine if the work will be performed on straight time or overtime, please reference the move-in and tear-out days of the event, and calculate your estimate accordingly.

Sample of Completed Order Form

Click here to see a sample of a completed plumbing order form.